![]() |
| Atlas O27 track is used for the pit rail |
![]() |
| Pit rail installation |
![]() |
| Pit wall installation |
![]() |
| Install arch on bridge deck |
![]() |
![]() |
| Atlas O27 track is used for the pit rail |
![]() |
| Pit rail installation |
![]() |
| Pit wall installation |
![]() |
| Install arch on bridge deck |
![]() |
![]() |
The ballast is still wet with glue. |
![]() |
Screw together the 2x4s (the foam padding on the sides is not needed) |
![]() |
Add an old towel |
![]() |
| Insert engine for servicing |